Norbord Europe Ltd. - New OSB Production Line - Inverness

The plant in Inverness was expanded by a production line for OSB boards.
We were commissioned to take over the coordination and compilation of plant and buildings. We were responsible for all plant frameworks and foundations on site. We especially did all the structural engineering for the area Holtec (wood area).

Our services included:
– coordination
– 3D modelling and collision check.
– Checking and approval of the plant installation
– Checking and coordinating of building services
– structural engineering
– infrastructure, cables, thermal oil, transportation routes
– steel structure workshop drawings
– reinforcementdrawings for concrete parts
– outdoor facility planning of roads and drainage

Completion: 2017
Investment costs: 130 Mio. €
Contact: Mr. McMeekin

Interspan - Production plant for OSB- and particle boards

A new production plant for OSB- and particle boards is to be erected on a previous production sit of the Swiss Krono group.

General planning: design, cost budgeting, co-ordination of machine and equipment layout, building and structural design, integration in the existing infrastructure, budget analysis for approval for the investors

Completion: 2014
Investment costs: 100 m €
Contact: Mr. Dr. Matthias Iredi

Krono Star - Addition of a continuous particle board line in an existing production plant

General planning: cost budgeting, machine and equipment layout, pre design, site feasibility, co-ordination with the local building authorities

Completion: pending
Investment costs: 50 m €
Contact: Mr. Dr. Matthias Iredi

Kronotec AG - Erection of an OSB-Plant

Production for OSB-Boards.

General planning: finding the suitable property, design of all buildings, co-ordination of the specialty planning for fire prevention and geology, preperation of all documents in russian; filing for building permit at the Russian authorities, static calculations according to SNiP-standard, design of infrastructure and draining systems, steelmanufacturing drawings, cost budgeting

Completion: pending
Investment costs: 200 m €
Contact: Mr. Dr. Matthias Iredi

Kronopol Sp.z.o.o. - Extension of the lumber storage area

The extension of the lumber storage area for the wood poduction plant Zary for Kronopol Sp.z.o.o by the area of 30,000m². Further, a second entry gate had to be concidered for the next building phase.

General planning: design, cost budgeting, execution planning, tender process, consultation for contracting, construction supervision, inspection and approval

Completion: November 2014
Construction costs: 3.2 m €
Contact: Mr. Prof. Dr. Joachim Hasch

Krono Ukraine - Erection of a new sanding line

Erection of a new sanding line with automated unfinished board storgage for the particleboard production in Broshiniv Osada, Ukraine.

General planning: design, cost budgeting, static calculations, reinforcement- and formwork drawings, steel modeling, steel manufacturing drawings, performance specifications, preparations for awarding contracts

Completion: 2013
Construction costs: 0.8 m €
Contact: Mr. Dr. Matthias Iredi

Swedspan Slovakia s.r.o. - Ercection of a production plant for particle- and OSB boards

Erection of a production plant for particle- and OSB boards in Malacky, Slowakia. Our scope of work included the production facilities with their buildings from the screening to the shipping department.

General planning: pre planning, design, cost budgeting, static calculations, reinforcement- and formwork drawings, steel modeling, steel manufacturing drawings, performance specifications, participating for awarding contracts, supporting construction supervision, quality inspection and approval

Completion: 2013
Investment costs: 140 m €
Contact: Mr. Luc Serdons

Kronotec AG - Modernization of a particleboard production plant

A new production line for particleboards was built for the Kronotec AG production plant in Charkow, Ukraine.

General planning: design, cost budgeting, static calculations, reinforcement- and formwork drawings, steel manufacturing drawings according to Ukrainian standards, performance specifications, preparations for awarding contracts

Completion: planning completed
Investment costs: 35 m €
Contact: Mr. Dr. Matthias Iredi